Sizing calculator

How many modules, how many hours, how many trucks.

Enter the plant load and the autonomy you need. The calculator uses LNGVault's published basis: LNG at 82,644 Btu/gal (LHV), 40% net electric efficiency, about 103 gallons of LNG per MWh.

50
MW of gas-fired generation running at full load.
24
Hours the plant must run from storage alone. Tier III/IV designs commonly plan for 24–72 hours.
Months until pipeline gas arrives. Shows total fuel through the bridge period.
3 × CryoSurge 4T
modules recommended
34.8 h
runtime at full load
Usable LNG on site
Net electric energy stored
Gas flow at full load
Fuel burn per day
LNG trailer deliveries
Indicative storage lease
Purchase price, modules only

Estimates for budgeting only. Trailer count assumes about 10,000 gallons of LNG per delivery. Lease is $4,000–5,000 per tank per month, indicative, before fuel and EPC. Final sizing depends on generation heat rate, dispatch profile, site layout, and NFPA 59A siting.

Runtime per module by facility load

CryoSurge 3TCryoSurge 4T
25 MW50 MW100 MW

Reference table

Plant loadGas flowLNG flowTrailers per dayHours per 3THours per 4TModules for 24 h
25 MW206 MCF/hr2,580 gal/hr6–717.423.42 × 3T or 1–2 × 4T
50 MW411 MCF/hr5,160 gal/hr12–138.711.63 × 3T or 2–3 × 4T
100 MW822 MCF/hr10,320 gal/hr25+4.45.86 × 3T or 4–5 × 4T
Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.