How it works

Six steps. Equipment ships at step five.

Permitting and refurbishment run in parallel, so the schedule is set by the AHJ, not by tank fabrication.

1
WEEK 1

Screening call

Load profile, autonomy target, pipeline and grid ETA, site constraints, generation type. We size modules and sketch a site arrangement against NFPA 59A setbacks.

2
10 BUSINESS DAYS

Budgetary proposal

Configuration, purchase and lease pricing side by side, EPC scope, fuel plan, deployment schedule. Every proposal quotes both buying and leasing.

3
WEEKS 3–4

Inspection and data room

Visit the Texas yard or review drawings, vacuum readings, inspection reports, and recertification records for the specific vessels allocated to your project.

4
CONTRACT

Sign and deposit

Purchase order, lease, or bundle agreement. Equipment is contracted separately from EPC milestones so refurbishment starts immediately.

5
60–120 DAYS

Ship, and permit in parallel

Modules are refurbished, recertified, and shipped in 60–120 days. In parallel we prepare the NFPA 59A submittal and work the AHJ process, typically 6–18 months depending on the jurisdiction's LNG experience.

6
FIRST GAS

Install, commission, fuel

Pad, containment, setting, piping, electrical tie-in, cooldown, first fill, ESD tests, operator training. CNGdelivery trailers begin scheduled deliveries against a contracted minimum inventory.

Compare: grid interconnection averages 5.2 years in PJM; a new tank alone takes 12–18 months. LNGVault's critical path is the permit, and we run it while the equipment is already being refurbished.

What you provide, what we provide

ScopeCustomerLNGVault
Site and accessLand inside the campus, road access for trailersSite arrangement, setback and containment design
PermitsAHJ fees, applicant of recordSubmittal package, pre-application, comment responses
Civil worksUnder lease: pad and fencing (or add to EPC)Under turnkey: pad, containment, foundations
Storage moduleOwned (turnkey) or leasedRefurbished, recertified CryoSurge 3T or 4T
GenerationTurbines or engines, or a named partnerGas at the battery limit: pressure, volume, quality
FuelCommodity price exposure unless fixedScheduled deliveries, minimum inventory, logs
OperationsSite operator interfaceMaintenance, recertification, 24/7 support
Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.