Turnkey sale + EPC

Own the module. We deliver the fuel yard.

Buy a CryoSurge module at roughly 35% below new and let LNGVault engineer, permit, install, and commission it as one subcontracted scope.

$978,000
CryoSurge 3T
$1,143,000
CryoSurge 4T
~35%
below new build
6–12 mo
typical first gas from contract

Who it is for

Owners who capitalize infrastructure. EPC and general contractors building behind-the-meter gas plants who want the LNG storage scope handled by one party with a fixed equipment schedule.

What is included

  • CryoSurge 3T or 4T, refurbished and recertified; R-stamp on any vessel repair; original plans and schematics.
  • Engineering: NFPA 59A / 49 CFR §193 layout, thermal-exclusion setbacks, secondary containment, P&IDs, electrical and controls drawings.
  • Permitting support: AHJ pre-application, submittal package, responses to comments.
  • Civil, mechanical, and electrical installation to a defined battery limit.
  • Commissioning: cooldown, first-fill coordination, ESD tests, operator training, as-builts.
  • 12-month refurbishment warranty; annual service plan available.

Not included

Generation equipment and its interconnect beyond the battery limit; LNG; AHJ permit fees; utility upgrades.

Pricing

QuantityCryoSurge 3TCryoSurge 4T
1$978,000$1,143,000
2$1,956,000$2,286,000
3$2,934,000$3,429,000
4$3,912,000$4,572,000

Module prices are list. EPC scope is quoted per site after screening. Equipment and EPC are contracted separately: deposit at signing, EPC on milestones, title on final payment.

Why refurbished

New tanks: 12–18 months and $250,000–350,000 each under the 2025 tariff stack. Our fleet: 30 terminals already in the country, run by a national fuel provider, with Chart, CVA, and Taylor-Wharton vessels, ACD pumps, CryoQuip vaporizers, and 16 brand-new Allen-Bradley control containers. See the fleet.

Request a purchase proposal

Other packages

Storage lease

Module on your pad for 5–10 years, maintained by us.

Storage lease

Fuel supply

Scheduled LNG deliveries with a firm minimum inventory.

Fuel supply

Power-as-a-Service bundle

Storage, fuel, and service under one fee.

Power-as-a-Service bundle
Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.