Skip to content
LNGVaulta CNGdelivery company
LNG tanks staged at the refurbishment yard

The fleet

30 terminals. One fleet. Ready now.

One of the largest inventories of LNG equipment available for immediate deployment in the United States, already in the country and already proven in service.

450,000
gallons of tank capacity
30
vertical cryogenic tanks
~125
ACD TC-34 pumps
40+
vaporizers
16
new PLC control containers

Gas Equipment 4 Sale acquired the complete equipment of 30 decommissioned LNG vehicle-fueling terminals, operated and maintained by a national fuel provider, then systematically dismantled and preserved for storage. Under the ArticUno LNG program this fleet is refurbished and re-engineered into CryoSurge modules.

EquipmentDetailCount
LNG tanksVertical, ~175 PSIG, 6,000 / 15,000 / 18,000 gal; Chart, CVA, Taylor-Wharton; documented vacuum readings~18 × 15K, ~8 × 18K, ~4 × 6K gal; 36,400 MCF total
Cryogenic pumpsACD TC-34 submersible, 40–70 GPM, 10–240 PSI, 25 HP, continuous duty; standalone and skid-mounted~125
Low-pressure vaporizersCryoQuip HAF-825-FBL10 saturation vaporizers, ~100 GPM LNG, up to 450 PSIG, all-aluminum, fan-equipped30+
High-pressure vaporizersCryoQuip and Nikkiso BAF-8100, 15 GPM / 74K SCFH, 5,500 PSIG10+
Control containersBrand-new 10×10 enclosed LNG command centers; Allen-Bradley CompactLogix + GuardLogix safety PLC; four populated PLC racks; ESD; pre-wired16
Balance of plantPiping and interconnects, electrical and control infrastructure, skids and mounting, mobile vaporizer and transport skidsPer module

Equipment photographs

18,000-gallon vertical LNG tank lifted by crane
18,000-gal vertical tank being set by crane
Rows of LNG tanks staged in a yard
Tank fleet staged at the Texas yard
Vertical LNG tank with vaporizer in operation
Tank and vaporizer in fueling service
Dual cryogenic pump skid
ACD TC-34 dual cryogenic pump skid
Aluminum finned ambient vaporizers
CryoQuip ambient vaporizers
Rows of vaporizers in inventory
Vaporizer inventory
Industrial control containers
Brand-new 10×10 control containers
Allen-Bradley PLC racks inside a control container
Allen-Bradley PLC racks, fully populated
CryoQuip vaporizer nameplate
CryoQuip HAF-825-FBL10 nameplate: 100 GPM, 450 PSIG

Refurbishment and recertification

Every module is inspected, refurbished, and recertified before deployment. Tanks are vacuum-checked, valves recertified, and any repair to pressure-retaining parts is performed under the National Board R-stamp program. Relief valves are set-point tested. Original plans and schematics are available for every terminal.

Refurbishment is performed with Markey Cryo and CCH Equipment. Customers are welcome to inspect allocated vessels at the Texas yard or to receive the inspection file in a data room before signing.

Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.