Skip to content
LNGVaulta CNGdelivery company

Partners

Fuel logistics, equipment, and cryogenic engineering under one name.

LNGVault is the customer-facing brand. Behind it stand four companies with the trailers, the tanks, and the engineers.

CNGdelivery

Parent company. Virtual pipeline logistics: CNG and LNG delivered by trailer to industrial customers without pipeline gas. Provides the fuel supply, scheduling, and delivery fleet behind every LNGVault contract.

cngdelivery.com

Gas Equipment 4 Sale (GE4S)

Owner of the 30-terminal LNG equipment fleet and of the ArticUno LNG repurposing program. Equipment allocation, refurbishment yard, and inspection data room.

gasequipmentforsale.com

Markey Cryo

Cryogenic engineering and service: vessel recertification, boil-off management, vaporization design, field service, and maintenance under lease and service plans.

markeycryo.com

CCH Equipment

Equipment refurbishment and rate-card partner: tank repainting, valve recertification, pump and vaporizer rebuilds, and skid assembly.

Partnering with LNGVault

Fuel logistics providers

Deliver gas but do not own stationary storage? Lease CryoSurge modules for your customer sites and turn a delivery schedule into a firm-supply contract. Storage lease.

EPC and general contractors

Subcontract the LNG storage scope to one party with a fixed equipment schedule and an NFPA 59A submittal package. Turnkey sale + EPC.

Turbine and engine OEMs and integrators

Include a sized storage and fuel plan in your proposal so the generation package can run before the pipeline exists. Under the bundle, your equipment is the named generation partner. Power-as-a-Service.

Talk to us

Start a partner conversation

Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.