CryoSurge modules

Two standardized modules. Any scale.

Vertical 18,000-gallon cryogenic tanks, ACD pumps, CryoQuip vaporizers, and an Allen-Bradley control container, pre-engineered as one package and sited to NFPA 59A.

Concept render of a CryoSurge 3T module

CryoSurge 3T

3 × 18,000-gal vertical tanks
Usable LNG45,000 gal
Stored gas3,690 MCF
Net electric energy436 MWh
Runtime at 25 / 50 / 100 MW17.4 / 8.7 / 4.4 h
$978,000$1,517,000 new build

CryoSurge 3T

Concept render of a CryoSurge 4T module

CryoSurge 4T

4 × 18,000-gal vertical tanks
Usable LNG60,800 gal
Stored gas5,022 MCF
Net electric energy581.3 MWh
Runtime at 25 / 50 / 100 MW23.4 / 11.6 / 5.8 h
$1,143,000$1,750,000 new build

CryoSurge 4T

What every module contains

Storage

Vertical 18,000-gallon double-wall vacuum-insulated tanks rated about 175 PSIG, by Chart, CVA, and Taylor-Wharton. Documented vacuum readings; recertified; R-stamp on any repair.

Pumps

ACD TC-34 submersible cryogenic pumps: a dual pump skid at 100 GPM and 10–200 PSI for vaporizer feed, plus a single 50 GPM load pump for transfer.

Vaporization

Two CryoQuip ambient vaporizer systems in the 250 MCF/hr class, up to 450 PSIG, all-aluminum, fan-assisted, sized for 25–100 MW per module depending on autonomy.

Controls

A brand-new 10×10 industrial control container with Allen-Bradley CompactLogix and a dedicated GuardLogix safety PLC, ESD, pump sequencing, flow and pressure monitoring, pre-wired for redundant power.

Balance of plant

Cryogenic interconnect piping, mechanical, electrical, safety and automation engineering, delivered as a pre-engineered package for a concrete pad in a fenced utility yard.

Standby

Active boil-off and pressure management so a module in backup service holds its fuel without venting until the day it is needed.

Scaling from pod to farm

Deployment tierConfigurationSupports
Pod1 module (3–4 tanks)10–25 MW
Mid-size farm5–10 tanks, N+1 piping25–60 MW, 24–72 h
Hyperscale farm10–20 tanks60–120 MW, 48–96+ h
Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.