Concept render of a CryoSurge 4T module

CryoSurge 4T

4 tanks. 581.3 MWh of gas on the pad.

4 × 18,000-gallon vertical cryogenic tanks with pumps, vaporizers, and a PLC control container, delivered as one pre-engineered package.

60,800 gal
usable LNG
5,022 MCF
stored gas
581.3 MWh
net electric energy at 40%
$1,143,000
vs $1,750,000 new build

Specification

ItemCryoSurge 4T
Storage4 × 18,000-gal vertical LNG tanks, ~175 PSIG (Chart, CVA, Taylor-Wharton)
Manufacturer capacity72,000 gal
Usable LNG60,800 gal / 5,022 MCF
Net electric energy581.3 MWh at 40% net efficiency
Runtime at 25 / 50 / 100 MW23.4 / 11.6 / 5.8 h
PumpsACD TC-34 dual pump skid (100 GPM, 10–200 PSI) + TC-34 single load pump (50 GPM)
Vaporization2 × CryoQuip ambient systems, 250 MCF/hr class, up to 450 PSIG
Controls10×10 industrial control container, Allen-Bradley CompactLogix + GuardLogix safety PLC, ESD, pre-wired for redundant power
Balance of plantCryogenic interconnect piping, mechanical, electrical, safety and automation engineering
StandbyActive boil-off and pressure management
Price$1,143,000 refurbished and recertified ($1,750,000 comparable new build)
LeaseIndicative $16,000–25,000 per month, 5–10 years
Ships60–120 days from contract

Runtime by load

Load1 module234
25 MW23.4 h46.8 h70.2 h93.6 h
50 MW11.6 h23.2 h34.8 h46.4 h
100 MW5.8 h11.6 h17.4 h23.2 h

Runtime scales linearly with module count. Size your site.

Site arrangement

Illustrative NFPA 59A site arrangement for a CryoSurge 4T module

Illustrative layout with thermal-exclusion setbacks and containment. Not for construction; final arrangement by the engineer of record and the AHJ.

Request a 4T proposal   Compare with CryoSurge 3T

Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.