Fuel supply

A virtual pipeline with a tank at the end of it.

Scheduled LNG deliveries from CNGdelivery's trailer fleet into your CryoSurge or existing storage, with the buffer that lets the plant run through delivery gaps.

12–13
trailers a day at 50 MW
11.6 h
buffer per 4T at 50 MW
24 h
replenishment after a low-level alarm
1–5 yr
terms with volume tiers

Who it is for

Any site running gas turbines or reciprocating engines without pipeline supply, or with a pipeline that can be curtailed. Sites already fed by trailers that want a buffer and a second supplier.

What is included

  • LNG sourced from regional liquefaction plants, delivered by trailer on a schedule that holds a contracted minimum tank level.
  • Level and pressure monitoring through the CryoSurge control container; delivery logs and monthly reconciliation.
  • Fuel planning against your dispatch profile; storm and peak-demand surge plans.
  • Optional CNG/VNG trailer supply for mixed-fuel sites.

Pricing structure

Index (Henry Hub or regional hub) plus a liquefaction and delivery adder per MMBtu, with volume tiers. Firm supply carries a take-or-pay floor on a contracted minimum; spot deliveries at a premium; optional fixed-price tranche. Adders quoted per region.

How much fuel a plant needs

Plant loadGas flowLNGTrailers per dayBuffer per 4T
25 MW206 MCF/hr2,580 gal/hr6–723.4 h
50 MW411 MCF/hr5,160 gal/hr12–1311.6 h
100 MW822 MCF/hr10,320 gal/hr25+5.8 h

Basis: 82,644 Btu/gal LHV, 40% net electric efficiency, about 103 gal LNG per MWh. Buffer scales linearly with module count. Run your own numbers.

At 50 MW a plant needs a trailer every two hours. Without a buffer one late truck starves the turbines. One CryoSurge 4T absorbs half a day; two absorb a full day. That is what turns trailer supply from a risk into a contract.

Request a fuel supply quote

Other packages

Storage lease

Module on your pad for 5–10 years, maintained by us.

Storage lease

Turnkey sale + EPC

Own the module; we deliver the fuel yard.

Turnkey sale + EPC

Power-as-a-Service bundle

Storage, fuel, and service under one fee.

Power-as-a-Service bundle
Next steps

From first call to equipment on site in 60–120 days.

  1. Site screening call within a week: load profile, timeline, pipeline and grid status. We size the configuration.
  2. Budgetary proposal in 10 business days: purchase and lease pricing, deployment schedule, site arrangement.
  3. Inspection and data room: visit the Texas yard or review drawings, inspection reports, and recertification records.
  4. Contract and deployment: equipment ships in 60–120 days; NFPA 59A permitting runs in parallel.

Request a quote

LNGVault, a CNGdelivery company1 (800) 716-6747 · dmitri@gasequipmentforsale.com

Equipment offered subject to availability. Capacities and runtimes are engineering estimates at 40% net electric efficiency and LNG at 82,644 Btu/gal (LHV); final figures are confirmed per project. Lease and EPC pricing indicative. Siting subject to NFPA 59A and local AHJ approval. Renderings are conceptual. LNGVault stores and delivers fuel; power generation is provided by the customer or a named generation partner.